November 2026 NDR User Interface Update
This release contains the following updates
NDR Project Creation
Well Projects - Changes to disclosure periods
Well Projects - Well events
Well Projects - Release Rules
Projects Table - Manage Inventory
Projects Table - Missing Data Request
Files Table - Edit Window - Well Projects
NDR Map - Offshore Carbon Licences
NDR Map - OS layers
NDR Project Creation
Creating new projects in the NDR has changed, from this point forward, only NSTA Team members will create all NDR Projects. Previously Users with the Company Data Manager role have been able to create their own projects.
In this update, this create project functionality has been removed from the Company Data Manager role. Therefore, if a new Project is required for a survey or well event, licensee users must use the new Project Creation Request form to request a new Project. The form is found at this web address (URL):
We recognise that timely data reporting depends on the availability of a project to receive the reportable information.
Licensee users now need to request the creation of a new Project via this new Project Creation Request form. The web address above takes you to the form. The URL is also available as a link on the front page of the NDR in the Notifications section.
Well Projects - Changes to disclosure periods
The Energy Act 2023 introduced secondary legislation that allows the NSTA to take a common approach to managing all new well information. Recently created or acquired data for all wells will be protected (that is, undisclosed or unreleased) for 30 months from the end date of the event to which the data relates.
This 30-month period includes a six-month reporting period during which the data is expected to be reported through the NDR.
- Data reported within the first six months will remain protected until the Project release date.
- Data reported after the six-month reporting period but before the end of the 30-month protection period will be released on the Project release date.
- Data reported after the 30-month protection period will be released immediately.
This approach addresses three key issues:
- For EA2016 petroleum licence wellbores, late reporting will no longer result in protection periods extending beyond what was originally intended.
- For PA1998 petroleum licence wellbores, other than abandonment-related data (see below), newly created information will receive an appropriate period of protection instead of being disclosed immediately, simply because it relates to an older well.
- For EA2023 licence wellbores associated with carbon storage licences, data will be managed using the same processes and handling rules as EA2016 wellbores.
Exception to the rules above
Information relating to PA1998 wellbores that is created in preparation for final abandonment will not qualify for the additional protection period where the wellbore has a Regulatory Completion Date before 1 January 2018.
The NSTA considers that, in line with established practice, this information should continue to be disclosed immediately upon receipt.
As all existing Projects for these PA1998 wellbores are already disclosed, the relevant files may be uploaded to the existing well Project. There is no requirement to create a new Abandonment Project to report final abandonment information for these wellbores.
Well Projects - Well events
The NDR is introducing Well Events for Well projects. Well Events are different self-contained Well activities that happen as a project. The introduction of Well Events allows the Well project creation to manage protection and disclosure periods for well data based on the date of the specific well event that generated the data. This replaces the current approach, where information is managed with reference to the wellbore's Regulatory Completion Date.
A single wellbore may have multiple NDR Projects. Each new NDR well project will be assigned one of the well events listed below:
- Initial Drilling and Completion
- Well Test or Extended Well Test
- Re-Completion
- Suspension Activities (AB1 & AB2)
- Abandonment Phase 3 (AB3)
- Workover or Intervention
- Sample Analysis
- Other Well Operations
Each Project will have its own End Date, which represents the end of the operational event. The End Date will be used to determine the protection and disclosure periods for data associated with that Project.
A table in the NSTA “Form and Manner” document summarises the Information Types (and respective CTAGs) that apply to each event type.
The changes in the NDR for users are.
- Only the NSTA will create new Projects, including well, seis, mhaz, intp and rems Project Types.
- Users need to request a new project through the updated NDR Project ID Creation Request process. Link to NSTA Project Creation Requests Form - https://forms.cloud.microsoft/Pages/ResponsePage.aspx?id=ncWB5o6Gh0iA-s428fIbD_pnGxYf1kVKtxvBvKYQ7HZURVJLUVRDUlVGSFQ3RkE3VVpJNDhFTjJGRS4u
- During Upload for Well Projects, the upload will accept only the Information Types (e.g. CTAGS) and File Types that are relevant to the project Well event type.
- Well file edits will accept only the Information Types (e.g. CTAGS) that are relevant to the project Well event.
- Missing Data Requests for Well projects will only be available for Information Types (e.g. CTAGS) that are relevant to the selected well event.
- The "Manage Inventory" page requires fewer Information Types to be marked as "Not Acquired" as only the CTAGs that are relevant to the selected well event are required.
An example of these changes is; A Drilling Programme document is only relevant to the Initial Drilling and Completion event type. As a result:
- The Drilling Programme CTAG will be available when uploading PDFs to an Initial Drilling and Completion Project.
- The Drilling Programme CTAG will not be available in Projects for other event types, such as Suspension or Sample Analysis.
Projects Table showing the Well Event column
The addition of well events has also updated the NDR metadata API with the addition of the ‘Well Event Name’ Attribute in the ‘Project ID Metadata’ list.
Well Projects - Release Rules
Release Rule metadata for Well Projects and Files is being introduced for new well projects to describe the Release Rules that are applicable. They are not currently applying to existing well projects.
Applying specific and explanatory metadata to each Project and File provides users with a clear understanding of the applicable rules, whether they are the standard rules that have been applied based on licence type and reference dates, or whether overrides for Early Release or Relinquishment have been applied.
Examples of the Well release Rules are shown in the image of the Projects table below:
Projects Table showing the Release Rule column.
Files Table showing the Release Rule column
The project level release rule is set on project creation as it is required for the subsequent addition of new files, the NDR upload then knows which release rule applies to the project and uses it to apply the release rule to the files in the project.
The release rule metadata format consists of two parts, the first, an optional override flag is used to change the behaviour and the second part is the release rule from the project licence. e.g <override>_<rrle licence flag>
The well release rule override values are:
- “Relinquished”
- “EarlyRelease”
The well release rule licence part is of the format:
Project format: <legislation>-<licence type>
File format: <legislation>-<licence type>-<number of years>
The Legislation possible values are:
- PA1998
- EA2016
- EA2023
The Licence type possible values are:
- PRODUC - Production
- CSTORE - Carbon Storage - mixed phase
RRLE for Projects Examples:
- PA1998-PRODUC
- EA2016-PRODUC
- EA2023-CSTORE
- Relinquished_EA2023-PRODUC
RRLE for Files Examples:
- EA2016-PRODUC-2
- Relinquished_EA2016-PRODUC-2
- EarlyRelease_EA2016-PRODUC-2
Projects Table - Manage Inventory
The “Manage Inventory” Window for Well projects will now show only the relevant subset of CTAG’s for the Projects Well Event value.
The “Deselect” radio button does not allow the user to remove an already set “Unavailable” or “Not Acquired” option. If these have been previously accidentally set then please raise a ticket with support to have them removed.
Manage Inventory window showing the reduced CTAG options for a Well project with a well event of “Abandonment Phase 3 (AB3)”.
Projects Table - Missing Data Request
The “Manage Inventory” Window for Well projects will now show only the relevant subset of CTAG’s for the Projects Well Event value.
Missing Data Request window showing the reduced CTAG options for a Well project with a well event of “Suspension Activities (AB1 & AB2)”
Files Table - Edit Window - Well Projects
For Well Projects the Files Edit Window now only shows the CTAGs that are applicable for the Well Event assigned to the Well Project.
File Edit window showing the reduced CTAG suggestion option for this project which is well event type “Abandonment Phase 3 (AB3)”
NDR Map - Offshore Carbon Licences
The NSTA Carbon Storage Licence map layers are now available on the NDR map and can be displayed by clicking the tick boxes under the Offshore Licences Group in the Map Sidebar.
NDR Map showing the NSTA carbon licence layers
NDR Map - OS layers
The NDR Map has Ordnance Survey (OS) layers as one of the basemap options. The “OS Onshore” basemap layer increases in detail as you zoom in to avoid the basemap clashing with any features being shown.
NDR Map showing the “OS Onshore” basemap layer
NDR Map showing the “OS Onshore” basemap layer zoomed in with more details